Abstract
Construction sector in Sindh faces various problems especially due to COST-BASED CONTRACTOR ION. Construction projects frequently encounter a range of intricate issues, including disagreements among project stakeholders like clients and contractors. The success of a project relies heavily on both the chosen contractor and the adopted project delivery method. The aim of this research is to explore the best method of procurement based on selection of contractor in the construction industry based on finding and analyzing the Project performance problems. SPSS software was used to interpret the collected data. From the problems associated with cost-based contractor selection; highest mean is of technical competence i.e. 4.30 and lowest mean is of use of up to date technology utilization i.e. 3.30. In addition to this, highest standard deviation is of safety problems i.e. 1.166 and lowest standard deviation is of technical competence i.e. 0.695 and Cronbachs alpha value is .908.
DOI LINK : 10.56726/IRJMETS51773 https://www.doi.org/10.56726/IRJMETS51773
Paper File to download :