Author: Pooja Ahirwar,Dr Anil Kumar Kori
Date Published: 09 Jan 2023
Abstract
Currently, solar energy becoming versatile choice of each industry person or engineer to fulfil the consumers energy demand. Numerous experiments and researches are progressing to shift the dependency from coal based energy system towards the green and clean energies. Recently, a feasible performance survey and design of a 100 kWp solar grid-tied PV system has been carried out for installation purpose via PVsyst for green city Jatani in Bhubaneswar, India. In current study, a simulation based planning, sizing, placement and performance examination of a 25 kWp solar grid synchronized PV system is carried out by using PVsyst, version 7.1.8, for 50 residential houses. These habitations are located around the Rawan Park in Jabalpur district of Madhya Pradesh, India. The coordinates of the site are 23.210 N, 80.000 E as latitude and longitude respectively. Further, the suggested system has the performance ratio of 71.64 % for fixed tilt angle i.e. 27. Additionally, the placement and operational features for 30 years of life span have been discussed in the following study. The PV system produces 35.89 MWhyear energy with specific energy production i.e. 1477 kWhkWpyear. Later on, analysis of CO2 emission reduction has been done for the suggested system and explained in upcoming sections of this analysis. Based on study, it is found that, the suggested PV system has the potential to fulfill the societal load efficiently. Further, this type of system is a futuristic method of energy generation as well as requirement of our society.
DOI LINK : 10.56726/IRJMETS32795 https://www.doi.org/10.56726/IRJMETS32795
Paper File to download :