Abstract
In this case study, the non structural part of the of the conventional building like walls , w. c. , doors and windows are changed by similar prefabricated parts (prefabricated walls , w.c.) . After doing so, by using MSP software cost benefit analysis is done. Time and cost taken by construction of conventional building to time and cost taken by construction of same prefabricated building have been comared. Afterwards the conclusions are drawn on the basis of results.